Temar sp.j.- nowe mieszkania i apartamenty na sprzedaż ,oferty nieruchomości we WrocławiuAbout UsInvestmentsReferencesContact
de enpl

Floor Presentation

Visual Presentation

Standard

Site management:

  • Fencing settles: steel
  • Entrance:
    • Splay gate,
    • Automatic barrier to enter the parking in underground. Free or entry fee.
  • Recreation area:
    • According to Project – 15 per cent of green field
    • Garden`s catering central system,
    • Boulevards
    • Park benches
  • Lighting area:
    • High lamps,
    • Park lamps ( low) ,
  • Playground:
    • According to project
  • Streets and foot - pathes:
    • Entrance and good traffic access,
    • Asphalt or pavement cobbles,
  • Further rooms:
    • waste and recycling boxes
  • Inner pargets:
    • gypsum
  • Elevation:
    • external heating-cover of fabric 14 cm,
    • siding tiber
    • siding stone
    • acrilic / silicone plasterboard

 

Standard of building:

  • Apartments and Offices:
    • From 3 up to 7 storey - building
    • Underground car - parking
    • Terraces, loggia, patio
  • External side walls:
    • stone/ constructional ceramics , e.g.. POROTHERM ( construction requirement)
    • concrete walls,
  • Roof top cover:
    • plasterboard, e.g. FILIGRAN,
    • roofing paper or roofing foil PCV 1,2 mm
  • Staircase:
    • Balustrades stood ( powder varnished),
    • Flooring - ceramic plates, e.g. Gres
    • Painted walls ( coverd with acrilic plasterboard)
  • Personal lifts
  • Sectional stone walls:
    • concrete ceiling / ceramic , e.g. , POROTHERM ( construction requirement)
  • Inner plasterboard:
    • gypsum,

Internal installations:
  • Installation of central heating:
    • Floor system heating
    • Plate-heaters in the kitchen and in the rooms,
    • Lauder- heater in the bathroom,

Files to download

 

1. Initiatory settlement contract ( Apartments Panorama)

 

2. Commission Info.

 

 

 

 

 

 

 

 

 

 

 

 

Finall works

Building works:

  • Flooring:
    • Clean cement slab,
    • Styrofoam,
    • Water proof isolation,
  • Inner plasterboard
    • Gypsum


Final Works:

  • Wood window:
    • Glue wood windows - merantii
    • Glass with heating resisstance K=1,1,
    • In apartments at first floor windows with aluminium external close system.
  • Inside window-sill made from wood with colour match to the windows or made from granithe,
  • Internal doors - HDF colour match to the window e.g. PORTA,
  • Appartment front – door: anti-housebreaking, e.g..:. PORTA, WITEX
  • Balkony:
    • Concrete plate / walls, e.g. FILIGRAN,
    • Metalic balustrades: stainless, or powder varnished
    • Full fill by safety glass or by acrylic plates (glas),
    • Ceramic tiles e.g. Gres
  • Ground - floor terrace:
    • From outside made a brick walls or hedge,
    • Garden area partialy finished by small concrete elements - cobble,
  • Two – level apartments:
    • Staircase made from wood e.g. beech,
    • At terrace ceramic tiles e.g. Gres
  • Terraces exluding the ground-floor
    • Metalic balustrades - stainless or powder painted,
    • Full fill by safety glass or by acrylic plates (glas),
    • Ceramic tiles e.g. Gres


Internal installations:

  • Installation of central heating:
    • Heating system in floor
    • Plate-heaters in the kitchen and in the rooms, - Lauder- heater in the bathroom,
    • Electronical meassure equipment ( heating – meter ) in stairway,
  • Water and canalization:
    • Hot and cold water made from PP pipes ( e.g. polyethylene )
    • Canalization made from PP pipes,
    • Hot and cold water pipes finished by stoppers,
    • Meassure equipment in stairway,
  • Electrical Installation :
    • Hide wires with system equipment without lighting equipment,
    • Power supply for electric cooker - 3 Phase system.
  • Phone, TV and internet instalations:
    • Video-door phone in anteroom,
    • TV connection point (in each room), with possibility to conect into network TV,
    • Phone and internet (in each anteroom and living room).



Some installation approaches can be carried from technological respects to the outside (top) part of construction bulkhead. All of those positions will be adopted, if predictable in documentation for concrete kind of object of agreement. By reason of aspiration for continuous improving product, DEWELOPER reserve the right to any changes of described finish of objects of agreements for elements and systems about comparable quality and standard.

Home    About Us    Investments    References    Contact    Site map   
©2006 Temar Sp.J.
Service based on sCMS. Valid CSS, XHTML | Sitemap | Realization